PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Duct work at the 1st (1) Floor Facing North (800x600).jpg Duct work at the 1st (2) Floor Facing North (800x600).jpg Installed hangers for the piping at the 1st Floor Facing West (800x600).jpg Layout for the 1st Floor Juvenile-Adult Cells Facing North-West (800x600).jpg Started laying out block at the 1st Floor Juvenile-Adult cells Facing North (800x600).jpg
Previous page Started laying out block at the 1st Floor Juvenile-Adult cells Facing North (800x600)
Started laying out block at the 1st Floor Juvenile-Adult cells Facing North (800x600)